Indonesia Island Port Construction Microgrid — BRIGHT EDGE Remote™ M200 deployment

Case Study 01

Indonesia Island Port Construction Microgrid

A mobile solar-plus-storage microgrid delivered by barge to an island port construction site with no grid connection, replacing round-the-clock diesel generation during the build programme.

Client type
Marine infrastructure contractor
Sector
Port construction
Location
Island site, Indonesia
Delivery
Barge-landed containerised system

Deployment background

The site sat on an island with no distribution network and no realistic path to a grid connection inside the construction programme. Every kilowatt-hour had to be generated on site.

Diesel was the default option, but fuel had to be shipped in by sea. Weather windows, barge scheduling and on-site storage all added cost and risk, and generator runtime had to be maintained even during low-load night periods.

The setting was environmentally sensitive coastline, so noise, fuel handling and spill risk were under scrutiny for the duration of the works.

Location: Indonesia | Application: Island Port Construction Site

Client data

M200
SystemSingle containerised mobile microgrid
Days
Time to operationFrom barge landing to first power
Displaced
Diesel runtimeSolar and storage carry base load
Relocatable
RedeploymentMoved with the works as demand shifted

Site conditions

  • No grid connection available within the project timeline
  • All fuel and equipment delivered by sea
  • Construction load profile changing month to month
  • Environmentally sensitive coastal location

The challenge

  • Remote island port construction with no access to grid power
  • Diesel generation costly and logistically complex to supply by sea
  • Environmentally sensitive coastal setting
  • Power demand changing as construction progressed

Scope of supply

  • BRIGHT EDGE Remote™ M200 containerised microgrid
  • Integrated solar PV array and battery storage
  • Intelligent diesel coordination and auto start/stop
  • Remote monitoring and dispatch via Bright Grid Nexus™
  • Relocation support as the construction front moved

Delivery timeline

  1. 01

    Load assessment and sizing

    Construction load profile modelled across build phases

  2. 02

    Barge delivery

    Containerised system shipped to the island site

  3. 03

    Commissioning

    Operational within days of arrival

  4. 04

    Operation

    Continuous supply through the construction programme

Technical specifications

System
BRIGHT EDGE Remote™ M200
Configuration
Containerised mobile solar + storage microgrid
Generation
Integrated solar PV array
Storage
LFP battery bank with integrated BMS
Hybrid control
Automatic diesel start/stop and load sharing
Enclosure
Containerised, relocatable, marine transportable
Environment
Tropical coastal, high humidity and salt exposure
Control platform
Bright Grid Nexus™ remote monitoring and dispatch
Deployment
Barge landing to operation within days
Grid interface
Off-grid island operation

Project documents

Download the full data sheet for this deployment, or the complete systems handbook covering every Bright Grid platform and series.

Loading documents…

The solution

Bright Grid deployed a BRIGHT EDGE Remote™ M200 mobile microgrid combining solar PV, battery storage and intelligent diesel coordination. The containerised system was delivered by barge and operational within days of arrival.

Outcome

Significant reduction in diesel generator runtime. Lower fuel consumption, reduced operating costs, and a scalable energy platform that adapted to changing construction demands throughout the project lifecycle. Demonstrates how mobile microgrids can accelerate infrastructure development in locations where grid access is unavailable or uneconomical.

  • Rapid deployment to remote island location
  • Significant diesel displacement from day one
  • Containerised and relocatable for project lifecycle
  • Scalable capacity as construction demands changed